Project Lead - Product Development  

Timeframe: 2017 - 2022
Client: MMID GmbH, Essen (Permanent Employment)

Projects

Project management for the development of a Class II medical device, covering the project phases (MMID) from Project Initiation to Product Optimization, with a focus on:

  • Mechanical design and kinematics
  • Verification and durability testing, particularly in accordance with IEC 60601-1
  • Development process and documentation within a quality management system, compliant with ISO 13485

Project management for the development of a device in the field of industrial automation, covering the project phases (MMID) from Project Specification through Product Optimization, with a focus on:

  • Electronics hardware and plastic injection-molded parts
  • Development, throughout the project, of a test system for the automatic testing and documentation of product functions within approved limit ranges

Highlights

  • Successful presentation of a Class II medical device project, which I managed as project manager, during an initial certification audit for the MMID quality management system in accordance with EN ISO 13485 at the Essen site
  • Preparation of process descriptions for internal company processes, e.g., for the systematic identification of regulatory requirements during product development

Activities

  • Planning project phases, estimating effort, and assessing required qualifications
  • Preparing project proposals and quotes for new and ongoing projects
  • Technical Leadership of Development Teams
  • Documenting project status for the client
  • Creating and maintaining project plans in MS Project, both during initial setup and for ongoing updates
  • Requirements management and traceability, from the client’s requirements specification through the technical design specification to the detailed component specification, across all project phases
  • Reviewing standards with regard to the requirements applicable to the product, in particular IEC 60601-1 and IEC 60335-1
  • Creating and updating bills of materials throughout the development process
  • Development of design concepts and kinematics in CAD, during the concept phase and design detailing
  • Construction of functional prototypes and models
  • Planning, execution, and documentation of verification tests
  • Review of project team deliverables, particularly in the areas of plastic injection-molded parts, mechanical design, and electronic hardware
  • Preparation and maintenance of complete project documentation in English
MMID Logo fuer Webseite